The problem

A formal connection application costs money and takes months. A parcel that fails on flood zone or protected land should never reach one. The public data that would rule it out sits in a dozen portals, each with its own format and its own ways of failing.

What I would build

A screening agent runs each candidate parcel through Luminus's MCP tools. They cover terrain, flood zone, protected land, grid proximity, distribution headroom from the five DNOs' published data, queue depth at the nearest grid supply point, and a rules-based Gate 2 checklist. Where an ENTSO-E key exists, they add a revenue sketch from price spreads. Every layer is graded pass, warn or fail. A layer that failed to load is graded unknown, not clear. A person decides which parcels go forward, and every report says it is not a connection offer.

The logic flow

Click any node to see what it does, what it passes on and where a person must approve.

Loading diagram...

What it returns

One keyless run on 2026-10-17 put a candidate point in Flood Zone 3 in a single call. A finding like that should end a site before money is spent. I have not measured a saving: this is a reference design on someone else's project, not a system I run. I have not tested the tools' correctness beyond that run.

Why it fits

A storage developer used to pay a consultant for the first look at a parcel. That meant the flood map, the designations, the nearest line and what the network operator's heat map said about the nearest substation. Every one of those layers is public, and the developer's own AI assistant can now fetch all of them in minutes. The mistake is to treat that as the old desktop study done faster. Asked for the best five sites, an assistant will rank parcels whose grid layer never loaded. It will state a missing answer with the same confidence as a measured one.

The design I would build keeps the speed and marks what is missing. A screening agent runs each candidate through Luminus's own tools: terrain, flood zone, protected land, distance to lines, distribution headroom from the operator's published data, the transmission queue at the nearest grid supply point, and a rules-based Gate 2 checklist. It grades every layer pass, warn or fail. A layer that failed to load is graded unknown, not clear. On a run on 2026-10-17, one point near Eggborough came back in Flood Zone 3, with 9.4 MW of generation headroom at a primary substation 2.45 km away. The grid-proximity layer returned nothing, because all three of its endpoints failed. The report says each of those things. A person decides which parcels go forward. Every report carries the line the project's README insists on: this is not a connection offer.

A five-year strategy for a developer or a network company could use the screen as the gate before money is spent. I offer this as a sketch, not a plan. Nobody would pay an application fee, sign a land option or commission an ecology survey on a parcel the public data already rules out. Year on year the screen becomes the firm's record of why it dropped each site. That record is worth more now that Gate 2, as Luminus's own checklist reads it, asks for a submitted planning application, land rights and a nominated connection point before a queue position. The consultant's hours then go to the parcels that survived, where the decision needs judgment that no tool can fetch.

See it run

Want one of these?

Every part of it is open source and you can host it yourself. I bring the build, the checks around the project's gaps and the judgement about where your gates should go.